[{"data":1,"prerenderedAt":277},["ShallowReactive",2],{"sanity-gdzYOe3XdMhcOZtJiYV6bxXIT_m7yz-RlBc-7UU9_P4":3,"sanity-s7kfeiugqZtCLlNBKnCSiFifFz_NmuChvBIQJYYkd_o":90},{"data":4},{"global":5},{"address":6,"email":35,"favicon":36,"legalPages":37,"metaDescription":51,"navigation":52,"ogImage":73,"phone":74,"siteTitle":75,"socials":76},[7,18,27],{"_key":8,"_type":9,"children":10,"markDefs":16,"style":17},"fc8c0c5ac98e","block",[11],{"_key":12,"_type":13,"marks":14,"text":15},"6081785dcf75","span",[],"KOMPLIZEN Industrieplanung und Architektur Part GmbB\nKomplizen GmbH",[],"tagline",{"_key":19,"_type":9,"children":20,"markDefs":25,"style":26},"aa5b48b95388",[21],{"_key":22,"_type":13,"marks":23,"text":24},"166ac7d7b754",[],"Industrial planning and architecture",[],"normal",{"_key":28,"_type":9,"children":29,"markDefs":34,"style":26},"ffb0bb870a51",[30],{"_key":31,"_type":13,"marks":32,"text":33},"9a5a153290d8",[],"Rhabanusstraße 3\n55118 Mainz, Germany\nApprox. 20 minutes from Frankfurt Airport",[],"info@komplizen.build","https://cdn.sanity.io/images/urjnmmx1/production/315db88d69495d3b8bcbab3af6f6fdc3232c2222-400x400.png",[38,46],{"_id":39,"_type":40,"page":40,"slug":41,"title":44,"type":45},"867c95d6-0b93-489e-a2d0-a51b8a782ccd","page",{"_type":42,"current":43},"slugField","impressum","Legal notice","internalLink",{"_id":47,"_type":40,"page":40,"slug":48,"title":50,"type":45},"62a0ee7f-b002-44e2-a82f-8a718d4c805d",{"_type":42,"current":49},"datenschutz","Privacy policy","KOMPLIZEN brings industrial planning, architecture and integrated design together. Based in Mainz, working across Germany. Formerly GHBA.",[53,58,63,68],{"_id":54,"_type":40,"page":40,"slug":55,"title":57,"type":45},"c5d6b855-afc0-4891-9ad0-716de964335a",{"_type":42,"current":56},"leistungen","Services",{"_id":59,"_type":40,"page":40,"slug":60,"title":62,"type":45},"b3559379-6af6-47fe-ab94-44510300fdc8",{"_type":42,"current":61},"team","Team",{"_id":64,"_type":64,"page":64,"slug":65,"title":67,"type":45},"projectsOverview",{"_type":42,"current":66},"projekte","Projects",{"_id":69,"_type":40,"page":40,"slug":70,"title":72,"type":45},"9a74f22e-3884-4fa3-aa96-9ba22d089485",{"_type":42,"current":71},"kontakt","Contact","https://cdn.sanity.io/images/urjnmmx1/production/7db98823dd60469aa96aafb3e1d65bf8f285d5a0-1200x630.jpg","+49 (0) 6131 62490 - 0","Komplizen",{"socials":77,"title":89},[78,84],{"_key":79,"hoverIcon":80,"icon":81,"title":82,"url":83},"2e1e7cde4443","https://cdn.sanity.io/images/urjnmmx1/production/beb2716dae7878a28a5936539879a01ca493c31b-36x36.svg","https://cdn.sanity.io/images/urjnmmx1/production/5a4a9f3b6075120bf4ebc24ffc8b9f46ee293621-36x36.svg",null,"https://www.instagram.com/komplizen_build/",{"_key":85,"hoverIcon":86,"icon":87,"title":82,"url":88},"70aeebd963f6","https://cdn.sanity.io/images/urjnmmx1/production/7ecaf8b7ffd702642fa9c98f6eb4de87b032042f-36x36.svg","https://cdn.sanity.io/images/urjnmmx1/production/e9b10954db18f576402ff32bf5e6c5b06a02142c-36x36.svg","https://www.linkedin.com/company/ghba---industrieplaner-architekten/posts/?feedView=all","Follow us:",{"data":91,"sourceMap":-1},{"global":92,"project":93},{"siteTitle":75},{"additionalFacts":82,"content":94,"description":119,"facts":169,"headline":174,"media":183,"mediaGallery":192,"previewText":255,"relatedPages":256,"seo":269,"slug":273,"subtitle":275,"title":276},[95],{"_key":96,"_type":97,"author":98,"function":99,"media":108,"quote":110},"c35839755831","quote","Domenico Sgró",[100],{"_key":101,"_type":9,"children":102,"markDefs":107,"style":26},"a08766e48a39",[103],{"_key":104,"_type":13,"marks":105,"text":106},"e0366c096c7d",[],"Architect and Managing Partner",[],{"_key":82,"alt":82,"crop":82,"dimensions":82,"hotspot":82,"image":82,"originalFilename":82,"type":109},"image",[111],{"_key":112,"_type":9,"children":113,"markDefs":118,"style":26},"8e6c65ab3775",[114],{"_key":115,"_type":13,"marks":116,"text":117},"1b6c1b6dd3fc",[],"“At first it sounded like a straightforward brief. It wasn’t. The specialist vehicles are enormous, and Airbus aircraft were constantly parked right beside the site. Now, whenever we fly, we look out of the window to see if we can spot our project.”",[],[120,129,137,145,153,161],{"_key":121,"_type":9,"children":122,"markDefs":128,"style":26},"be1adf33a215",[123],{"_key":124,"_type":13,"marks":125,"text":127},"404ce860f3b1",[126],"strong","A site with little room for compromise.",[],{"_key":130,"_type":9,"children":131,"markDefs":136,"style":26},"490425628b9f",[132],{"_key":133,"_type":13,"marks":134,"text":135},"702d070bbc0e",[],"The plot lies on apron P60, west of CargoCity North. Existing infrastructure, including the main sewer collector and a stormwater retention basin, could not be built over. Airport operations continued throughout the 15-month construction period, with aircraft parked immediately beside the site. Moving the security fence also meant moving the effective Schengen boundary.",[],{"_key":138,"_type":9,"children":139,"markDefs":144,"style":26},"3946b2eb1191",[140],{"_key":141,"_type":13,"marks":142,"text":143},"670d4136f764",[126],"Test the vehicles. Then draw the plan.",[],{"_key":146,"_type":9,"children":147,"markDefs":152,"style":26},"120d5df450fa",[148],{"_key":149,"_type":13,"marks":150,"text":151},"0aedd5b5de75",[],"The site is around 35 metres wide and more than 400 metres long. As swept-path data was unavailable for the oversized vehicles, we carried out driving trials during early design. A 60-degree angled parking arrangement with one-way circulation proved the best solution, accommodating around 80 vehicles under cover and a further 120 outside.",[],{"_key":154,"_type":9,"children":155,"markDefs":160,"style":26},"b883cd93ab68",[156],{"_key":157,"_type":13,"marks":158,"text":159},"f72dc3075320",[126],"One facility. Many different demands.",[],{"_key":162,"_type":9,"children":163,"markDefs":168,"style":26},"f6c4b4e79c81",[164],{"_key":165,"_type":13,"marks":166,"text":167},"b4220eea2ce1",[],"Parking, wash bays, workshops, de-icing material storage and a brake-testing station are combined with staff and operations accommodation for more than 400 people. The architectural design brings these different requirements into a coherent whole.\n\nRobust reinforced concrete structures withstand heavy vehicles and de-icing materials. The expanded aluminium façade is compatible with radar and the Instrument Landing System, changing from white through grey to almost black with the viewing angle. Its energy and structural design support long-term use and adaptability.",[],{"bauherr":170,"kenndaten":171,"projekt":172,"standort":173},"Fraport AG","Gross floor area 12,800 m² / Gross building volume 65,000 m³","Winter services depot","Frankfurt Airport",[175],{"_key":176,"_type":9,"children":177,"markDefs":182,"style":26},"94d9ffb07355",[178],{"_key":179,"_type":13,"marks":180,"text":181},"08a54d24a346",[],"Fraport’s new winter services facility at Frankfurt Airport brings vehicle storage, workshops and administrative and operational teams together. It accommodates snow-clearing and cleaning vehicles alongside the facilities that keep them ready for service.",[],{"_key":82,"alt":184,"crop":82,"dimensions":185,"hotspot":82,"image":190,"originalFilename":191,"type":109},"Fraport winter services depot with vehicle halls and offices beside Frankfurt Airport’s apron.",{"_type":186,"aspectRatio":187,"height":188,"width":189},"sanity.imageDimensions",1.4997070884592854,1707,2560,"image-a69764b13252191b8844eeed64997771c73b1538-2560x1707-jpg","fraport-thumbnail.jpg",[193,201,207,213,219,225,231,237,243,249],{"_key":194,"alt":184,"crop":82,"dimensions":195,"hotspot":82,"image":199,"originalFilename":200,"type":109},"13bf02012822",{"_type":186,"aspectRatio":196,"height":197,"width":198},1.5,1280,1920,"image-f255cdd385af60135cb21a570a991d51bf3f9a53-1920x1280-jpg","fraport-01.jpg",{"_key":202,"alt":203,"crop":82,"dimensions":204,"hotspot":82,"image":205,"originalFilename":206,"type":109},"2247501c05e8","Winter services vehicles outside the long façade of Fraport’s depot.",{"_type":186,"aspectRatio":196,"height":197,"width":198},"image-9964ba438b38573c9685089c77d970dbfd5c08de-1920x1280-jpg","fraport-02.jpg",{"_key":208,"alt":209,"crop":82,"dimensions":210,"hotspot":82,"image":211,"originalFilename":212,"type":109},"d9a1030e3611","Fraport winter services depot with an office wing and tall glazed vehicle doors.",{"_type":186,"aspectRatio":196,"height":197,"width":198},"image-89a7776021fea2f5bc9036406ab837c96c629f93-1920x1280-jpg","fraport-03.jpg",{"_key":214,"alt":215,"crop":82,"dimensions":216,"hotspot":82,"image":217,"originalFilename":218,"type":109},"d54bf86aeee9","Winter services vehicle being maintained beneath the overhead crane in Fraport’s workshop.",{"_type":186,"aspectRatio":196,"height":197,"width":198},"image-3fd8911c48d23ccc0c3757c6c55e82b5fea55754-1920x1280-jpg","fraport-05.jpg",{"_key":220,"alt":221,"crop":82,"dimensions":222,"hotspot":82,"image":223,"originalFilename":224,"type":109},"44a35f2263f8","Glazed vehicle doors beneath the metal façade of Fraport’s winter services depot in evening light.",{"_type":186,"aspectRatio":196,"height":197,"width":198},"image-1cd121d5db0362a80db9613000400468f088aaf1-1920x1280-jpg","fraport-04.jpg",{"_key":226,"alt":227,"crop":82,"dimensions":228,"hotspot":82,"image":229,"originalFilename":230,"type":109},"9699acc2398b","Illuminated Fraport winter services depot behind a fence at dusk.",{"_type":186,"aspectRatio":196,"height":197,"width":198},"image-f83b73e634dc4d4c424b3ff33d9341382b5dd636-1920x1280-jpg","fraport-06.jpg",{"_key":232,"alt":233,"crop":82,"dimensions":234,"hotspot":82,"image":235,"originalFilename":236,"type":109},"19fd01260afb","Fraport winter services depot at night, with an aircraft and illuminated apron.",{"_type":186,"aspectRatio":196,"height":197,"width":198},"image-33d9a00acc500fbb037f026fca466c98877c91d3-1920x1280-jpg","fraport-07.jpg",{"_key":238,"alt":239,"crop":82,"dimensions":240,"hotspot":82,"image":241,"originalFilename":242,"type":109},"ef199f3cf664","Snow-clearing vehicle inside Fraport’s tall workshop with steel structure and rooflights.",{"_type":186,"aspectRatio":196,"height":197,"width":198},"image-f77f20cb9a570f618428430f2ae8eff8ecd05ee6-1920x1280-jpg","fraport-08.jpg",{"_key":244,"alt":245,"crop":82,"dimensions":246,"hotspot":82,"image":247,"originalFilename":248,"type":109},"0e9087984437","Workshop with storage racks and exposed steel structure at Fraport’s winter services depot.",{"_type":186,"aspectRatio":196,"height":197,"width":198},"image-980dde721dcd3df0dffd27317764c260b6ea3ed7-1920x1280-jpg","fraport-09.jpg",{"_key":250,"alt":251,"crop":82,"dimensions":252,"hotspot":82,"image":253,"originalFilename":254,"type":109},"b15ee14a76ae","Winter services vehicle beneath the projecting roof of Fraport’s depot.",{"_type":186,"aspectRatio":196,"height":197,"width":198},"image-4b2152771b9ccf0ed0ac2b1f6f760fcb68d0b223-1920x1280-jpg","fraport-10.jpg","Winter services at an airport mean oversized vehicles, limited space and shifting security boundaries while operations continue. For Fraport, we brought logistics, workshops and workplaces together in one robust facility on a tightly constrained site.",[257,264],{"_id":258,"_type":259,"page":259,"slug":260,"title":263,"type":45},"57735dda-85b3-4d5b-a151-036eca604660","project",{"_type":261,"current":262},"slug","poly-clip-system","Poly-clip System",{"_id":265,"_type":259,"page":259,"slug":266,"title":268,"type":45},"a1594ed9-e6d1-4f42-a2ed-a06d020f59b3",{"_type":261,"current":267},"minitec","MiniTec",{"metaDescription":270,"metaTitle":271,"notIndexed":272,"ogImage":82},"Fraport’s winter services depot at Frankfurt Airport: vehicle storage, workshops and staff facilities delivered during ongoing airport operations.","Fraport winter services",false,{"_type":261,"current":274},"winterdienst-fraport","Airport operations","Fraport winter services",1795613081307]