
MiniTec
Automation technology
MiniTec’s new facility in Schönenberg-Kübelberg brings production, administration and supporting functions into a clear, connected structure. Its modular design takes its cue from the company’s own products.
Project
Production and office facility
Location
Schönenberg-Kübelberg
Client
MiniTec GmbH
Key figures
Gross floor area 14,450 m² / Gross building volume 114,325 m³
A framework for future growth.
With no further room to develop at its original headquarters, MiniTec chose a new site nearby. The first phase establishes a modular framework for later extensions, allowing the facility to grow alongside the business.
From drawing board to production floor.
Production and administration are clearly organised yet closely linked. Workshops, measurement rooms and design offices sit immediately beside manufacturing, giving engineers direct access from their desks to the production hall.
Connected spaces. Integrated logistics.
A sequence of spaces links the entrance foyer, courtyard and canteen, production hall and the lightwell of the later extension. Generous glazing creates views between departments. Loading and an enclosed truck bay are integrated into the building, allowing goods to move directly into the hall.
The dark office volume contrasts with the production hall’s light aluminium panels, glass and translucent surfaces. Orange accents drawn from MiniTec’s identity mark the main entrances.








“The building is as flexible as MiniTec’s own systems. Many people join as apprentices and stay for their entire working lives, so the building becomes part of their home. And once a year, the enclosed truck bay turns into a venue for the summer party.”
Sven Bickel
Architect and Managing Partner