[{"data":1,"prerenderedAt":276},["ShallowReactive",2],{"sanity-gdzYOe3XdMhcOZtJiYV6bxXIT_m7yz-RlBc-7UU9_P4":3,"sanity-gu-ACZn8OfkuXRfQ2ZBy3a-oNmGGI-ojRd1KbT1J9gE":90},{"data":4},{"global":5},{"address":6,"email":35,"favicon":36,"legalPages":37,"metaDescription":51,"navigation":52,"ogImage":73,"phone":74,"siteTitle":75,"socials":76},[7,18,27],{"_key":8,"_type":9,"children":10,"markDefs":16,"style":17},"fc8c0c5ac98e","block",[11],{"_key":12,"_type":13,"marks":14,"text":15},"6081785dcf75","span",[],"KOMPLIZEN Industrieplanung und Architektur Part GmbB\nKomplizen GmbH",[],"tagline",{"_key":19,"_type":9,"children":20,"markDefs":25,"style":26},"aa5b48b95388",[21],{"_key":22,"_type":13,"marks":23,"text":24},"166ac7d7b754",[],"Industrial planning and architecture",[],"normal",{"_key":28,"_type":9,"children":29,"markDefs":34,"style":26},"ffb0bb870a51",[30],{"_key":31,"_type":13,"marks":32,"text":33},"9a5a153290d8",[],"Rhabanusstraße 3\n55118 Mainz, Germany\nApprox. 20 minutes from Frankfurt Airport",[],"info@komplizen.build","https://cdn.sanity.io/images/urjnmmx1/production/315db88d69495d3b8bcbab3af6f6fdc3232c2222-400x400.png",[38,46],{"_id":39,"_type":40,"page":40,"slug":41,"title":44,"type":45},"867c95d6-0b93-489e-a2d0-a51b8a782ccd","page",{"_type":42,"current":43},"slugField","impressum","Legal notice","internalLink",{"_id":47,"_type":40,"page":40,"slug":48,"title":50,"type":45},"62a0ee7f-b002-44e2-a82f-8a718d4c805d",{"_type":42,"current":49},"datenschutz","Privacy policy","KOMPLIZEN brings industrial planning, architecture and integrated design together. Based in Mainz, working across Germany. Formerly GHBA.",[53,58,63,68],{"_id":54,"_type":40,"page":40,"slug":55,"title":57,"type":45},"c5d6b855-afc0-4891-9ad0-716de964335a",{"_type":42,"current":56},"leistungen","Services",{"_id":59,"_type":40,"page":40,"slug":60,"title":62,"type":45},"b3559379-6af6-47fe-ab94-44510300fdc8",{"_type":42,"current":61},"team","Team",{"_id":64,"_type":64,"page":64,"slug":65,"title":67,"type":45},"projectsOverview",{"_type":42,"current":66},"projekte","Projects",{"_id":69,"_type":40,"page":40,"slug":70,"title":72,"type":45},"9a74f22e-3884-4fa3-aa96-9ba22d089485",{"_type":42,"current":71},"kontakt","Contact","https://cdn.sanity.io/images/urjnmmx1/production/7db98823dd60469aa96aafb3e1d65bf8f285d5a0-1200x630.jpg","+49 (0) 6131 62490 - 0","Komplizen",{"socials":77,"title":89},[78,84],{"_key":79,"hoverIcon":80,"icon":81,"title":82,"url":83},"2e1e7cde4443","https://cdn.sanity.io/images/urjnmmx1/production/beb2716dae7878a28a5936539879a01ca493c31b-36x36.svg","https://cdn.sanity.io/images/urjnmmx1/production/5a4a9f3b6075120bf4ebc24ffc8b9f46ee293621-36x36.svg",null,"https://www.instagram.com/komplizen_build/",{"_key":85,"hoverIcon":86,"icon":87,"title":82,"url":88},"70aeebd963f6","https://cdn.sanity.io/images/urjnmmx1/production/7ecaf8b7ffd702642fa9c98f6eb4de87b032042f-36x36.svg","https://cdn.sanity.io/images/urjnmmx1/production/e9b10954db18f576402ff32bf5e6c5b06a02142c-36x36.svg","https://www.linkedin.com/company/ghba---industrieplaner-architekten/posts/?feedView=all","Follow us:",{"data":91,"sourceMap":-1},{"global":92,"project":93},{"siteTitle":75},{"additionalFacts":82,"content":94,"description":119,"facts":169,"headline":173,"media":182,"mediaGallery":187,"previewText":255,"relatedPages":256,"seo":269,"slug":272,"subtitle":274,"title":275},[95],{"_key":96,"_type":97,"author":98,"function":99,"media":108,"quote":110},"563ae851c3cd","quote","Domenico Sgró",[100],{"_key":101,"_type":9,"children":102,"markDefs":107,"style":26},"a08766e48a39",[103],{"_key":104,"_type":13,"marks":105,"text":106},"e0366c096c7d",[],"Architect and Managing Partner",[],{"_key":82,"alt":82,"crop":82,"dimensions":82,"hotspot":82,"image":82,"originalFilename":82,"type":109},"image",[111],{"_key":112,"_type":9,"children":113,"markDefs":118,"style":26},"14c7226ddfd4",[114],{"_key":115,"_type":13,"marks":116,"text":117},"09d47658fb6e",[],"“Our first high-rise. Sometimes we wonder whether there is a more complicated façade anywhere in Germany. We built beneath pipework, past it and around it — while production carried on throughout.”",[],[120,129,137,145,153,161],{"_key":121,"_type":9,"children":122,"markDefs":128,"style":26},"501cf3a725d2",[123],{"_key":124,"_type":13,"marks":125,"text":127},"e5d36d65e274",[126],"strong","Construction around continuous production.",[],{"_key":130,"_type":9,"children":131,"markDefs":136,"style":26},"c2ddcdef1d0d",[132],{"_key":133,"_type":13,"marks":134,"text":135},"f25d33d4be32",[],"The brief was to improve the building’s energy performance with an insulated metal rainscreen façade and new solar-control glazing. Throughout construction, all nine production lines continued operating 24 hours a day, seven days a week.",[],{"_key":138,"_type":9,"children":139,"markDefs":144,"style":26},"3dfc9ce69302",[140],{"_key":141,"_type":13,"marks":142,"text":143},"9755354b5842",[126],"Every pipe accounted for.",[],{"_key":146,"_type":9,"children":147,"markDefs":152,"style":26},"9541c712e52c",[148],{"_key":149,"_type":13,"marks":150,"text":151},"47bc9ad18482",[],"Dense networks of equipment and pipework run along the external walls and had to remain operational. A 3D laser scan provided the basis for precise surveys and design. Scaffolding and façade connections were planned around the existing installations; short-notice adjustments to scaffolding were part of daily work.",[],{"_key":154,"_type":9,"children":155,"markDefs":160,"style":26},"48db680c95d1",[156],{"_key":157,"_type":13,"marks":158,"text":159},"de152c5b08f5",[126],"Coordination makes it possible.",[],{"_key":162,"_type":9,"children":163,"markDefs":168,"style":26},"cba712170a81",[164],{"_key":165,"_type":13,"marks":166,"text":167},"db09a95e3d30",[],"Close coordination with Boehringer Ingelheim’s team, process engineers, building services specialists and plant engineers was essential. A phased construction programme ensured that each intervention remained compatible with production. Technical expertise and creative problem-solving were needed on both sides.",[],{"bauherr":170,"kenndaten":82,"projekt":171,"standort":172},"Boehringer Ingelheim Pharma GmbH & Co. KG","Synthese A — building envelope refurbishment","Ingelheim",[174],{"_key":175,"_type":9,"children":176,"markDefs":181,"style":26},"e4536f837599",[177],{"_key":178,"_type":13,"marks":179,"text":180},"a83b429d7f7e",[],"Synthese A is a key part of Boehringer Ingelheim’s pharmaceutical production. Active ingredients for some of the company’s most important medicines are manufactured here around the clock. The 1960s high-rise contains production equipment, building services and offices across seven above-ground storeys.",[],{"_key":82,"aspectRatio":183,"mp4Supported":184,"playbackId":185,"thumbTime":82,"type":186},"16:9",false,"kCkmyXGgJsgjrIK5WkVHMFfQiwE6diz5vvYLCfzmdkU","video",[188,198,207,213,219,225,231,237,243,249],{"_key":189,"alt":190,"crop":82,"dimensions":191,"hotspot":82,"image":196,"originalFilename":197,"type":109},"76a8a9057c02","Façade of Boehringer Ingelheim’s synthesis building with pipework and maintenance walkways.",{"_type":192,"aspectRatio":193,"height":194,"width":195},"sanity.imageDimensions",0.7201388888888889,1440,1037,"image-cc11bbe7accd0171658fc2618d7ab4eeb553375e-1037x1440-jpg","boehringer-01.jpg",{"_key":199,"alt":200,"crop":82,"dimensions":201,"hotspot":82,"image":205,"originalFilename":206,"type":109},"58c7ca42fcd1","Boehringer Ingelheim’s synthesis building with external pipework, walkways and equipment.",{"_type":192,"aspectRatio":202,"height":203,"width":204},1.5,1280,1920,"image-88efb00b86369b926a101ba45991d6f7d74776cf-1920x1280-jpg","boehringer-02.jpg",{"_key":208,"alt":209,"crop":82,"dimensions":210,"hotspot":82,"image":211,"originalFilename":212,"type":109},"b1373c0ce97e","Vertical pipework and technical installations outside Boehringer Ingelheim’s façade.",{"_type":192,"aspectRatio":193,"height":194,"width":195},"image-916ec60020c7e06ed8b3b6fc979f37a8068cd323-1037x1440-jpg","boehringer-03.jpg",{"_key":214,"alt":215,"crop":82,"dimensions":216,"hotspot":82,"image":217,"originalFilename":218,"type":109},"c9003bf609b8","Pipes, valves and connections inside Boehringer Ingelheim’s synthesis building.",{"_type":192,"aspectRatio":202,"height":203,"width":204},"image-3e42813f7dfa193765b0029aa1fac8e03dbe3044-1920x1280-jpg","boehringer-04.jpg",{"_key":220,"alt":221,"crop":82,"dimensions":222,"hotspot":82,"image":223,"originalFilename":224,"type":109},"f32746977824","Employee working beside process equipment in Boehringer Ingelheim’s synthesis building.",{"_type":192,"aspectRatio":202,"height":203,"width":204},"image-cc77b416e605ed362707169e36df71778c74b284-1920x1280-jpg","boehringer-05.jpg",{"_key":226,"alt":227,"crop":82,"dimensions":228,"hotspot":82,"image":229,"originalFilename":230,"type":109},"238e170dd0d9","Detail of pipework with valves and instruments at Boehringer Ingelheim.",{"_type":192,"aspectRatio":193,"height":194,"width":195},"image-64b51e276ad74bcc43dddd421bdd69775f4332c2-1037x1440-jpg","boehringer-06.jpg",{"_key":232,"alt":233,"crop":82,"dimensions":234,"hotspot":82,"image":235,"originalFilename":236,"type":109},"9f056c9df2db","Narrow maintenance passage between equipment in Boehringer Ingelheim’s synthesis building.",{"_type":192,"aspectRatio":193,"height":194,"width":195},"image-5543a90ef6f46541e53149604716f6ac3ac4cea4-1037x1440-jpg","boehringer-07.jpg",{"_key":238,"alt":239,"crop":82,"dimensions":240,"hotspot":82,"image":241,"originalFilename":242,"type":109},"12aa98abfe0e","Dense pipework and maintenance walkways outside Boehringer Ingelheim’s façade.",{"_type":192,"aspectRatio":193,"height":194,"width":195},"image-da77d4adf6deb5ef95d473feee4ed78d0fa28237-1037x1440-jpg","boehringer-08.jpg",{"_key":244,"alt":245,"crop":82,"dimensions":246,"hotspot":82,"image":247,"originalFilename":248,"type":109},"fe18547ea415","Pipework in front of a window at Boehringer Ingelheim’s synthesis building.",{"_type":192,"aspectRatio":193,"height":194,"width":195},"image-5e5020fc475247dafc19d40a1755fdda9e09cd9e-1037x1440-jpg","boehringer-09.jpg",{"_key":250,"alt":251,"crop":82,"dimensions":252,"hotspot":82,"image":253,"originalFilename":254,"type":109},"367828729ff3","Ventilation ducts and pipework on Boehringer Ingelheim’s synthesis building.",{"_type":192,"aspectRatio":202,"height":203,"width":204},"image-2249993c7fd20eaf52b0172432fb677ec0da6ea5-1920x1280-jpg","boehringer-10.jpg","Refurbishment while pharmaceutical production continues: we upgraded the energy performance of Boehringer Ingelheim’s Synthese A building envelope, working around complex plant installations while active ingredients were produced around the clock.",[257,264],{"_id":258,"_type":259,"page":259,"slug":260,"title":263,"type":45},"f1254411-1570-427b-9f8d-9fc425fa108b","project",{"_type":261,"current":262},"slug","winterdienst-fraport","Fraport winter services",{"_id":265,"_type":259,"page":259,"slug":266,"title":268,"type":45},"57735dda-85b3-4d5b-a151-036eca604660",{"_type":261,"current":267},"poly-clip-system","Poly-clip System",{"metaDescription":270,"metaTitle":271,"notIndexed":184,"ogImage":82},"Energy refurbishment of Boehringer Ingelheim’s Synthese A building while nine production lines continued operating around the clock.","Boehringer Ingelheim",{"_type":261,"current":273},"boehringer-ingelheim","Pharmaceutical production","Boehringer Ingelheim synthesis building",1795613081309]