Boehringer Ingelheim synthesis building
Pharmaceutical production
Synthese A is a key part of Boehringer Ingelheim’s pharmaceutical production. Active ingredients for some of the company’s most important medicines are manufactured here around the clock. The 1960s high-rise contains production equipment, building services and offices across seven above-ground storeys.
Project
Synthese A — building envelope refurbishment
Location
Ingelheim
Client
Boehringer Ingelheim Pharma GmbH & Co. KG
Construction around continuous production.
The brief was to improve the building’s energy performance with an insulated metal rainscreen façade and new solar-control glazing. Throughout construction, all nine production lines continued operating 24 hours a day, seven days a week.
Every pipe accounted for.
Dense networks of equipment and pipework run along the external walls and had to remain operational. A 3D laser scan provided the basis for precise surveys and design. Scaffolding and façade connections were planned around the existing installations; short-notice adjustments to scaffolding were part of daily work.
Coordination makes it possible.
Close coordination with Boehringer Ingelheim’s team, process engineers, building services specialists and plant engineers was essential. A phased construction programme ensured that each intervention remained compatible with production. Technical expertise and creative problem-solving were needed on both sides.










“Our first high-rise. Sometimes we wonder whether there is a more complicated façade anywhere in Germany. We built beneath pipework, past it and around it — while production carried on throughout.”
Domenico Sgró
Architect and Managing Partner